call us today : +86-18620106756

send a message : sales@mbshouse.com

project
project

Prefabricated Container Hotel in Malaysia

hot products

Prefabricated Container Hotel in Malaysia

2017-08-29

Prefabricated Container Hotel in Malaysia

This Hotel is build near to oil site, it's main for workers from the site.

This hotel use 180units detachable Container House, and cost around 3 months to complete.

Each Container have 1 toilet+ 1 bedroom;


Details about the detachable container house:

Size : 2400*5900*2800mm/3000*6000*2800mm
Steel structure : Square tube and bending steel plate
Wall: 50mm EPS sandwich panel /rock wool sandwich panel,0.326/0.376/0.426/0.476mm steel sheet
Wall color: White color and optional colors
Roof: 50mm EPS sandwich panel /rock wool sandwich panel ,0.326/0.376/0.426/0.476mm steel sheet
Door : 50mm EPS sandwich panel /rock wool sandwich panel,0.326/0.376/0.426/0.476mm steel sheet  with lock /optional doors
Window : Aluminum sliding door, PVC sliding door with security bar
Floor: MGO board /optional floor
Decoration wall: Optional : PVC cladding ,WPC cladding
Electricity: Optional standard
Install Time: 4 workers 3 hours
Wind resistance: wind speed≤120 km/h
Earthquake resistance: Grade 7
Snow load capacity of roofing: 0.6kn/m2
Live load capacity of roofing: 0.6kn/m2
Wall permitted loading: 0.6kn/m2
Heat conductivity coefficient: 0.35kcal/m2hc
Delivery time: About  15-20 working days
Container loading: 12 sets/1*40HQ




NEWSLETTER SIGN UP

Please read on, stay posted, subscribe, and we welcome you to tell us what you think.
If you have questions or suggestions,please leave us a message,we will reply you as soon as we can!